PARS Environmental, Inc.
MSDS Database
Site Remediation & Construction Services

PARS is a full service Contractor, providing single source responsibility for many of our clients' needs.  Many of our clients elect to assign us total responsibility for development and implementation of remedial action plans and the design and replacement of building structures and landscapes disturbed by the remediation process. We can take your project from start to finish by developing plans, choosing qualified professionals & subcontractors and executing the work to meet your budget, your schedule and your level of quality.

Services Include:

  • UST Removal and Installation
  • Site Remediation
  • Site Construction & Grading
  • Install and Repair Septic Systems
  • Installation of Helical Piers
  • Installation – Operations and Management of Groundwater Recovery and Treatment Systems
  • Tank Installation, Maintenance, Cleaning and Closure Services
    • UST’s & AST’s
    • Oil & Water Separator Systems
  • Storm, Water, & Sewer Pipe Installations
  • Vacuum Truck/Tanker Services
  • Stormwater Management
 Transportation, Disposal, and Recycling for:
  • Contaminated Soils
  • Wastewater
  • Waste Petroleum and By Products
  • Hazardous and Non-Hazardous Waste

Project Experience

Sandy Hook

UST Removal at Gateway National Recreation Area, Sandy Hook, NJ

Belton Local

Bank Stabilization at Belton Local Training Area, MO

Excavation of impacted soils from a hydraulic lift system in a former auto shop in NJ.